Clean-up and Maintenance

At the end of each session, it is expected that the members will help clean up the studio for the next session. EVERYONE is responsible for equipment clean- up after each use and to assist in workshop clean-up at the close of each work session.  If you must leave early, clean something up before you leave.

ALL dirty water will be poured outside, we will show you where. 

6″ Trim Saws

  1. Drain coolant into holding container – don’t pour down drain.
  2. Clean cutting table with sponge.
  3. Wipe out reservoir with paper towel.
  4. Leave cutting table propped up to expose reservoir.

EZ-CAB Machine & Lortone Twin Arbors

  1. Open outer two water flow valves to allow water to drain from tubing, then re-close.
  2. Using sponge & small bucket, soak up all the remaining wastewater and clean off stone residue.
  3. Empty the small cleaning buckets into the black 3-gallon waste buckets.
  4. Empty wastewater bucket in designated area outside.

Final Check

  1. Verify all switches are in OFF position & LED lights are off.
  2. Return stools, chairs, and tables to their storage locations.
  3. Make sure all supplies and extra wheels are put away in the cabinet.
  4. Verify cabinet is locked.
  5. Check that double doors are locked.

No sludge created from the use of the machines will be disposed of down drains. All sludges will be confined to a bucket, taken out and disposed of in the designated area.